Here we are at the week four recap of our One Room Challenge™ featuring our guest bathroom (check out Week OneWeek Two, and Week Three). I’m calling Week Four, the week we got sh*t done. After a few slow weeks of waiting on plumbing and other progress-halting stuff, we made a lot of visible progress. Here’s how the week went down:

On Thursday morning the plumbers showed up to make a few adjustments and add some nail plates… all before I finished my breakfast and morning coffee. Thursday night, we laid the plywood subfloor in anticipation of the plumbers coming Friday to set the drains.

On Friday, the plumbers pushed back their start time, until ultimately saying they’ll be postponing to 8A on Saturday morning. We spent Friday night hanging the drywall on the ceiling… wow, that’s an arm and shoulders workout.

Saturday morning we get up at 8A to let the plumbers in. After asking half a dozen times about whether we needed to frame out our tub before setting the drains and being told no… they check out our tub and tell us we need to frame it in first. Cue to me having a panic attack over the timing implications to them not setting the tub that day. We end up agreeing to build the frame within the subsequent hour and a half, so they could return that afternoon. Then we ran around like crazy people building a frame for the drop-in tub that was 100% level and took into consideration the number of tiles we wanted running up the tub enclosure + grout lines + floor tile height, etc in order to get the frame just the right size. It was pretty much like the SATs meets an overdramatized speed decorating HGTV series. We were nailing the last side of the frame in place as the plumbers showed up. They worked at the house all afternoon and I took a break from the chaos to source accessories at Anthropologie. That evening we laid the cement board on the floors with thinset and screws in preparation for tile.

Sunday morning we awoke early again, to tackle the walls. We clad two of the walls and the tub frame in cement backerboard and hung drywall on the other walls. The entire installation process was a giant game of Tetris. Again, lots of math.

Monday evening was dedicated to hanging the last of the drywall. Tuesday night we set about mudding and taping the seams. Wednesday we mudded the drywall and hooked up the radiant flooring electrical.

Whew, I’m exhausted just reading that recap.

Here are the not so sexy photos of the current state of our bathroom.

UM5A2867.jpg

UM5A2848.jpg

I know it doesn’t look like much, but it’s a huge leap forward from where we were just a week ago.

And one pretty photo of our vanity hardware that arrived from Rejuvenation this week, swoon!

IMG_6893.JPG

This week, we’re priming the ceiling and walls in preparation for tile, as well as applying a waterproof membrane on the tub walls. And then it’s on to finally laying the radiant floors and marble hex tiles. We have the vanity arriving this weekend and we’re planning on spending the full weekend laying tile.

As a heads up, the One Room Challenge has been extended by a week, so I expect it might just be possible that we can pull this transformation off. Maybe.

Here’s to hoping next week’s photos include our pretty tiles…