Site icon Erin Kestenbaum

One Room Challenge: Guest Bathroom, Week Six

Week Six of the One Room Challenge™ has been all about tiling the walls. (You can check out past week updates here: week one, week two, week three, week four, week five). Because I’m an overachiever, or maybe just really confident in our skills to figure out how to accomplish the look I’m going for, I ambitiously opted to tile our entire bathroom. That includes the tub surround and all four walls. And did I mention we’d never tiled before?

Excuse the mess in all these photos – this isn’t glamorous work.

The all-over tile really helps to elevate the subway tile. And, I’m very particular about my tile transitions and wasn’t entirely certain of a way to end the tile around our tub, given it’s location in the room in a way that felt elegant.

We have been tiling non-stop since Friday night and since taking these photos knocked out most of the final wall.  Serious props to my husband, Cory, who kept us going on tiling, despite me nearly throwing in the towel more than a few times.

In the original room, the window trim butted right up against the wall, which would make tiling around it really awkward. We ended up sourcing new trim that was 2 1/4” wide instead of 2 1/2” wide that allows for just enough space to slide the tiles behind the window trim for a much cleaner and more intentional look. They don’t, however, make rosettes that are 2 1/4” square, so we ended up using the table saw to slice 1/8” off each side of the rosettes to line everything up nicely. This whole issue gave me some anxiety, but I’m so happy with how we managed to make it work.

For the tile, these are some of the things we’ve learned:

All in all, while this was an insanely huge task, I’m so happy we stayed on the path to tile all the walls. Given how inexpensive subway tile is, the cost to do all the walls is still very low (I think we spent ~$350 on subway tile) but the impact is huge. I know it’s a tile that’s everywhere, but given it’s historical roots, I do believe it will stand the test of time. Especially applied in a way that is so immersive and detail oriented, it really takes the room to the next level.

What’s really going to finish off these walls is the grout (we’re going with a medium grey) and crown moulding. I know crown moulding is an unusual choice in the bathroom, but I believe it’s going to pull together all the rooms we’ve completed in the house as a cohesive story. Plus it really blends the traditional with the modern in this room.

In addition to tiling, we also painted the door, replaced the door trim, replaced the window trim and painted the crown moulding.

Lest we forget that we have to reveal this room NEXT WEEK. Which means we have a ton to accomplish before then:

Well, this is going to be a sprint to the finish line!

Don’t forget to check out all the other participants here.

Exit mobile version