One Room Challenge: Guest Bathroom, Week Five

Welcome back to our One Room Challenge™ status update (check out past weeks here), where we have taken our guest bathroom down to the studs (we’re overachievers, I know) and are working on building it back up. My husband, Cory, and I have done nearly all the work on our own, excluding the plumbing.

Week Five was without a doubt our most challenging week. It started out easy enough: we primed and painted the ceiling, primed the fresh drywall (apparently it helps with tile adhesion) and painted a waterproof membrane over the tub walls and any floor that might become wet.

Saturday, we dedicated to tiling the floor. We spent 5 hours dry-fitting the marble hex tile for the floor, making all the cuts in advance of laying the tile and making sure there weren’t any clusters of marble tones that would make the room feel imbalanced. We numbered every sheet that needed to be laid and relocated them to our bedroom floor for later. While Cory was prepping some of the final tiles, I went on an expedition to track down a marble threshold to replace the one we cracked while demo-ing the tile. Three stores later, and I found a lucky threshold that exactly fit my dimensions and had been cut custom for someone else who never picked it up from this local marble shop in Fairfield County. A 20% discount later since it was pre-cut for someone else and I took that baby home with me. We also had the vanity delivered and now have all the big pieces ready for install, waiting in the garage.

IMG_6973.jpeg
A not-so-glamourous iPhone photo of us dry-fitting the marble hex tile.

We then spent the afternoon laying the radiant coils for the in-floor heating and got started on laying the tile. Ok guys, I had been so excited to tile and the actual tiling process was the closest to divorce we’ve experienced yet ha. It was really difficult for a perfectionist like myself. The combination of the in-floor heating plus the small mosaic tiles made it so difficult to get the tiles to lay flat and level. We ripped up the tiles multiple times before getting into a groove. 15 hours later on Saturday and we finally had our tiles laid.

We had planned to grout on Sunday but that morning we noticed a handful of tiles that just weren’t sitting quite right and we chiseled them out and replaced them. Again, we did the same thing on Monday night while cleaning out any remaining thinset from between the tiles.

Tuesday night we finally grouted the floors and it was a turning point – the tiles looked great and we got into a really good system for grouting and wiping down the tiles. We finished up by 10P, our earliest night yet working on the One Room Challenge bathroom and relished in having a little bit of time to relax.

Wednesday night we allowed the grout to dry. We chose Polyblend’s Custom Delorean Grey grout and it’s such a nice complement to tones in the carrera marble tiles. We’re planning on using the same grout on the subway tiled walls to tie both surfaces together. I’m going to dive into our decisions for how we’re laying the subway tile in the room next week, once we’ve got it all up on the walls.

This coming week is going to be a big push so we can get the room ready for the plumbers to return to install the vanity and tub. Where we’re planning on:

  • Sealing the marble floors
  • Laying subway tile on all four walls
  • Grouting the walls
  • Installing the recessed shower light
  • Painting and installing the ceiling medallion

And apologies, but pretty photos are pretty lacking this week, these are some shots of our new floors:

IMG_6995 copy.jpg

And a tile decision that we’ve been debating for the walls is how to finish the tiles at the floor, since our cove finish moulding isn’t lining up with the outside corners of our tub.

Either finish the walls off in the standard, but totally modern way:

Or soldiering the tiles at the floor:

Image result for tub surround subway tile

To be completely honest, looking at these photos again, I’m pretty certain we’re going to be going with the former option. But totally let me know what you think! There’s still time to sway the vote before the tiles start to go up on Friday.

Check out the other participants here.
downloadORC.png

Leave a Reply